| Under Pass |
|
- This category includes vehicular under pass, pedestrian underpass and minor bridges.
- It’s a major structure of Highway Projects.
- RCC having enough shuttering and staging material with proper team to complete underpasses within the time.
- RCC did 60 m length V.U. P. at O. R. R.- I. at Hydrabad in record time of 3 months.
|
|
| |
|
|